Home / Curbs, Sidewalks and Flatwork
Curbs, Sidewalks and Commercial Flatwork
We pour curb and gutter, sidewalks, ADA ramps, dumpster pads, equipment pads and site flatwork for property owners, HOAs and general contractors across Hernando County and the Tampa Bay area. We work to the civil drawings and to the city or county inspector. Call 352-585-5058 or send the form for a free written estimate.
Recent work





Get a free written estimate
Tell us about the job. We look at every job in person before we give you a final price, and nothing is due until that price is in writing and you have said yes. Rather talk? Call 352-585-5058.
- Free, no obligation site visit
- Written price before any money changes hands
- Residential and commercial
What is included
- Layout from civil plans or a site walk
- Removal and haul off of damaged concrete
- Compacted base and forms or curb machine set to grade
- Detectable warning surfaces on ADA ramps
- Thickened sections at drive crossings
- Broom finish, joints and cleanup
- Traffic control coordination when work is in the road
Specs that matter
- Sidewalks. 4 inches standard, 6 inches where vehicles cross.
- ADA ramps. Running slope and cross slope built to the plans and the inspector's checklist, with detectable warning panels.
- Curb. Built to the type shown on the civil plans.
- Dumpster pads. 6 to 8 inches with rebar. Trucks drop full containers on them every week.
- Strength. 3,000 psi minimum, higher where specified.
What it costs
| Item | Typical range |
|---|---|
| Sidewalk, 4 inch, per sq ft | $8 to $12 |
| Sidewalk at drive crossings, 6 inch, per sq ft | $10 to $14 |
| Curb and gutter, per linear ft | $30 to $55 |
| ADA ramp, each | $1,800 to $3,500 |
| Dumpster pad, 6 to 8 inch with rebar, per sq ft | $12 to $18 |
Rough planning ranges, not quotes. Removal, traffic control, small quantities, curb type and testing requirements change the price. Commercial work is bid from the plans.
Permits, right of way and HOA rules
Permits and inspections
In unincorporated Hernando County, permits run through the Building Division at 789 Providence Boulevard in Brooksville. Inside Brooksville city limits and in Pasco and Citrus counties, a different office handles it. Whether your job needs a permit depends on what it is and where it is, so we confirm with the right office before we give you a final price, and when a permit is needed we pull it and schedule the inspections. Permit fees are passed through at cost and shown on your estimate as a separate line.
Aprons and the right of way
The strip between your property line and the road usually belongs to the county, not to you. Hernando County Public Works requires prior approval for work in the county right of way, so a new or widened driveway apron gets its own right of way use permit on top of any building permit. If your driveway or patio crosses a recorded utility or drainage easement, the county's Planning and Zoning office has a separate Use of Easements permit for that. We check the plat for both before we price the job.
We work across the area, including curbs, sidewalks and flatwork in Brooksville, curbs, sidewalks and flatwork in Spring Hill, curbs, sidewalks and flatwork in Hernando Beach, curbs, sidewalks and flatwork in Weeki Wachee, curbs, sidewalks and flatwork in Masaryktown, curbs, sidewalks and flatwork in Hudson, curbs, sidewalks and flatwork in New Port Richey, curbs, sidewalks and flatwork in Land O' Lakes, curbs, sidewalks and flatwork in Wesley Chapel, curbs, sidewalks and flatwork in Dade City, curbs, sidewalks and flatwork in Inverness, curbs, sidewalks and flatwork in Crystal River, curbs, sidewalks and flatwork in Lutz, curbs, sidewalks and flatwork in Zephyrhills, curbs, sidewalks and flatwork in Homosassa, curbs, sidewalks and flatwork in Ocala, curbs, sidewalks and flatwork in The Villages, curbs, sidewalks and flatwork in Tarpon Springs, curbs, sidewalks and flatwork in Odessa, curbs, sidewalks and flatwork in Tampa.
What to expect, start to finish
You call or send the form
Tell us the job and send a few photos if you have them. We call or text back, usually the same business day.
We visit and measure
Michael walks the site, checks grade, drainage, access for the truck, the property line and any easement or right of way.
You get a written price
A line by line estimate: square footage, thickness, steel, finish, tear out, permits. Nothing is due until you approve it.
Permits and approvals
We pull the permits the job needs and help with HOA paperwork. We schedule the pour once approvals are in hand.
Prep and pour day
Forms, base and steel go in, we get the inspection if one is required, then pour and finish. We watch the radar and move the date for heavy rain.
Cure, cleanup and walk through
We cut joints, clean up, and walk the job with you. We tell you when you can walk on it and when you can drive on it.
Frequently asked questions
Do you replace trip hazard sidewalk sections?
Yes. We remove and replace damaged sections and match the existing grade so the new panels sit flush.
Can you build ADA compliant ramps?
Yes. We build to the plans and the inspector's slope requirements and install detectable warnings.
Do you work for HOAs and property managers?
Yes. We can survey sidewalks across a community, price the worst sections first and phase the work.
Do I need a permit for sidewalk work?
Work in the public right of way needs approval from the city or county that owns it. We handle the permit.
How thick should a dumpster pad be?
We pour 6 to 8 inches with rebar, depending on the truck and container size.
Do you work on small quantities?
Yes. A single panel or ramp is fine. Small jobs cost more per square foot because setup is the same.
What our customers say
We are a young company with an old crew. Our Google reviews are where past customers tell it straight, good or bad. If we have poured for you, we would be grateful if you left one.
Sources
- Hernando County Public Works: Right of Way Use Permit
- Hernando County Building Division permit packet (789 Providence Blvd, 352-754-4050)
- American Concrete Institute (ACI): concrete industry standards
Rules change. We confirm current requirements with the permitting office on every job.
Price your flatwork
Send plans or photos and we will get you a number. Call 352-585-5058 or send the form.
Page updated November 3, 2026.