Step 1: Find out who owns your permit
A mailing address is not enough. Many Brooksville, New Port Richey and Dade City addresses are outside city limits. The office is decided by where the parcel actually sits.
| Where the property is | Who issues permits |
|---|---|
| Unincorporated Hernando County (Spring Hill, Weeki Wachee, Hernando Beach, Masaryktown) | Hernando County Building Division, 789 Providence Blvd, Brooksville |
| Inside Brooksville city limits | City of Brooksville |
| Unincorporated Pasco County (Hudson, Land O' Lakes, Wesley Chapel, Odessa) | Pasco County Building Construction Services, New Port Richey |
| Inside New Port Richey, Dade City or Zephyrhills | That city's building department |
| Unincorporated Citrus County (Homosassa, Citrus Springs, Floral City) | Citrus County Building Division, Lecanto |
| Inside Inverness or Crystal River | That city's building department |
| Unincorporated Hillsborough (Lutz, part of Odessa) | Hillsborough County |
Step 2: Is the job exempt?
Pasco County publishes the clearest rule: its exempt work list includes non-structural concrete flatwork under 500 square feet per parcel. A small patio or walkway may not need a building permit in unincorporated Pasco. Exempt work still has to meet setbacks and the Land Development Code.
Hernando and Citrus counties do not publish a simple square footage line that we rely on, and Citrus County notes that zoning, flood plain, septic and driveway approvals can apply even when building work is exempt. We call before we price.
Usually needs a permit: slabs that carry a building (garage, shed over the exempt size, screen room, carport), footings and foundations, block walls, and most large driveways. Shed exemptions vary: Pasco exempts approved sheds of 150 square feet or less outside flood zones, while Sumter County's list stops at 100 square feet.
Step 3: Aprons and the right of way
The strip between your property line and the road usually belongs to the county or city. Work there gets its own approval no matter how small the job is.
- Hernando County: all work in the county right of way needs prior approval from Public Works.
- Hillsborough County: driveway connections need a Driveway Access permit through HillsGovHub.
- New Port Richey: the city's driveway worksheet requires any part of a driveway in the right of way to be 6 inch thick concrete, a 3 foot side and rear setback, total impervious area under 60 percent of the lot, and an inspection after forming and before any concrete is placed.
If a driveway or patio crosses a recorded utility or drainage easement in Hernando County, there is also a Use of Easements permit through Planning and Zoning.
Step 4: Flood zones and farm buildings
Coastal lots in Hernando Beach, Homosassa, Crystal River and Tarpon Springs often sit in FEMA flood zones. Flood rules mainly control how structures are built, and an elevation certificate may be required. Look up your lot at the FEMA Flood Map Service Center.
Under Florida Statutes 604.50, qualifying nonresidential farm buildings on bona fide agricultural land are exempt from the Florida Building Code, but not from flood plain rules. Hernando County, for example, requires a notarized affidavit, Greenbelt classification and proof of agricultural use.
Step 5: Inspections and who files
When a permit is required, the licensed contractor usually pulls it. We do that on every job that needs one and schedule the inspections, typically after forms and steel are set and before the pour. Permit fees go on your estimate at cost.
HOA approval is separate
A county permit does not replace HOA approval, and HOA approval does not replace a permit. In deed restricted communities like Timber Pines, Heritage Pines and The Villages, the architectural review committee usually has to approve a driveway, patio or wall first. Florida law backs that authority when it is in the community's recorded documents.
Related pages